26/07/2014

I have now finished the electrical work in the bedroom. It’s a novel experience, to be able to find a light-switch next to the door, press it, and be rewarded by illumination! Up until now, we’ve had to go in in the dark, and switch on one of the two bedside lights. I’ve also installed another plug point, so we no longer have an extension lead trailing across the floor (to power the bedside lights!)

The completion of wiring in this room means that I can now commence the building of a partition wall, prior to breaking through into the barn. Who knows; by winter-time we may even have an indoor bathroom…

3 thoughts on “26/07/2014”

  1. Who knows; by winter-time we may even have an indoor bathroom… It is always winter there? (well done so far) jc

    1. Let’s just say that for us, summer was the month of June.
      Since then it has been like George. (Is their registration still CAW?)

Leave a Reply to v8owner Cancel reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.